Friday, October 19, 2012

ikeymaster Project. Part #1. Sliding door frame construction progress from start to end.

Written by  ikeymaster.

Part #1. Sliding door frame construction progress from start to end.(Now)


Part #2. Setting mechanical unit & Frame door & Lobby phone. (Later will posted)

Site : Cinema production


This site is a building of Broadcasting studio.

Added a CCTV System.

The CCTV Controller working with auto-sliding controller & Safety guard system.


Now, this post will shows you how to build a door frame for sliding door & box for Lobby phone.

Welding by TIG(Argon weld machine) be helped with Laser level.










The picture of button end is a box for Lobby phone.

It support Access control(RFID) & Camera for CCTV system.

This combination works are called of "Integrated security system" what I made the name and built for your "safety living".....